Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | grantham_canal |
Date time: | 5.34pm, Friday 30th August, 2019 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | kevjs1982 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Melton Mowbray |
The surfacing on the towpath has now ended, unsurfaced for a number of km
Comments reflect the views of the original submitter only.