Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 3.25pm, Monday 15th June, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Bingham |
Path is too narrow due to overgrowth, soil creep, rubbish and and general farm vehicle mess.
Cut back the growth, move the soil and stones, collect the debris: restore the path back to its 2 metre width
Comments reflect the views of the original submitter only.