Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 1.26am, Friday 24th July, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Bingham |
Awful junction for cyclists: going straight on you can be cut up by impatient vehicles undertaking in the left lane. Vehicles often occupy the ASL: need warning signs/cameras/penalties for doing so. This whole area is the scene of frequent close passed by vehicles: safe passing width 1.5m signs needed + enforcement.
Comments reflect the views of the original submitter only.