Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 1.48am, Friday 24th July, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Bingham |
Cycleway needs to made continuous as entering/exiting is hazardous, also vehicles often speeding/belligerent towards cyclists and pedestrians. Should be made continuous all along Wilford Road, not the useless side - change into parked/wheelie bin blocked shared "pavement" fiasco
Comments reflect the views of the original submitter only.